November 2009 Build Photos

November build hours: 83                                    28-Dec-09

29 Nov.

Before tie sting.

After.

24 Nov.

Pump control box.

Bleeding

Letting the air settle out.

12vcd power outlets

15 Nov.

The mess under the boat.

Where it all goes.

Buss box wiring.

Looking from aft forward.

10 Nov.

Some of the cabin lighting.

Red lights lit.

White lights lit.

Mess of wiring by the bus boxes.

Antenna wire and nke bus box by mast.

Connecters for mast wires.

Wiring under panel before....

...and after tidying up.

Solar panel connector.

With cover off.

 

 