March 2010 Build Photos

March build hours: 12                               13-Mar-10

13 Mar 10

Pins on the mast wires.

Connector in place.

Cooler base getting epoxied down.

Lots of weight to hold it in place.

Supports for the head base.

Head base with epoxy.

Head? Porta-Potty?

Tabs filed off.

Bow rail getting painted.

11Mar 10

Cooler base before coving with epoxy.

And after.

Pole use to stuff the foam up in the mast.

End so the foam would not turn sideways.

Foam ready to be pushed up.

Wires from the holes.

 

 

Return to Home Page                                                Return to Photo Gallery