June 2008 Build Photos

June build hours: 47                                                                          22-Jun-08

Jun 21

A bunch of LED lights

Keel finaly faired

Jun 20

More fairing bog on keel.

Drill, cutting fluid, brearing holder.

One 4mm pilot hole and 6mm final size.

Carbide drill bit.

Bearing holders.

Sanded keel.

Final touch up filler.

Jun 09

Keel with more compound on it.

Jun 08

Reading lights on right.

Switches are for white and red LEDs in the cabin.

Jun 03

Ground out box corner.

Wooden axle.

Epoxy mix on tape covered holders.

And in place in the box.

Back side of floor boards.

 

 

Return to Home Page                                                Return to Photo Gallery