January 2010 Build Photos
January build hours: 22 01-Feb-10
31 Jan 10
Mast head bracket attached
All complete, almost.
A good shot of the windex hitting the strobe.
01 Jan 10
Will drill out and rivet the other holes after the epoxy filler sets up.
Return to Home Page Return to Photo Gallery